|
army info
|
|
Topic Started: Apr 22 2010, 04:42 PM (14,661 Views)
|
|
Jacapo Saladin
|
May 25 2009, 05:27 PM
Post #931
|
Administrator
- Posts:
- 6,212
- Group:
- Admin
- Member
- #1
- Joined:
- December 27, 2008
|
- Jacapo Saladin
- May 23 2009, 05:10 PM
- Jacapo Saladin
- May 12 2009, 09:47 PM
- Jacapo Saladin
- May 12 2009, 04:07 PM
- 5 million dollars will be paid to USA for the licensing
- 1 Kuznetsov class carrier are being laid down. Workers are flocking to be apart of the first carrier built by China. Workers will be pushed to get the carrier out in time.
- The chinese carrier design will be finalized and the designs will be given to the government for approval
- J-10B production will start up full time again, with war looming with UK, we will need all the aircraft possible. An order of 200 will continue.
Plans to build a kuznetsov have been scrapped, instead we will wait for our design to be complete. 20 Type 041A are ordered. 4 Will be laid down at Bohai, 2 at Jiangnan, 4 at Wuhan, 4 at Huludao, 2 at Hudong, 2 at dalian, and 2 at Zhonghua
The subs have been structurally completed, as well as some vital equipment such as engines. Fitting of the rest of the electronics will begin.
Subs Finished, and are on sea trials until commisioning
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:44 PM
Post #932
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
10 SeaWolf class submarines have been ordered. 14 Virginia class submarines have been ordered.
2 SeaWolf and 2 Virginia have been laid down.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:45 PM
Post #933
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 20 2009, 04:01 PM
The Patriot PAC-3 missile systems have all finished receiving the PDB-6 and MSE upgrades.
An additional 128 PAC-3 with all upgrades has been ordered.
The 128 PAC-3 with all upgrades has been finished and delivered.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:46 PM
Post #934
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 23 2009, 09:09 AM
- Rakthor
- May 21 2009, 08:56 AM
- Rakthor
- May 20 2009, 02:54 PM
The 14 Ohio class subs that are SSBNs are ordered to be converted to SSGNs.
**Classified**
The Arrow II ABM system is being ordered to supplement the Patriot system. 1,000 Arrow II units are ordered.
4 of the 14 are dry docked and begin conversion. **Classified** 10 of the Arrow II units are completed.
4 are 25% complete. **Classified** 20 Arrow II units completed. An order for 10,000 Arrow missiles has been put in.
4 are 50% complete.
**Classified**
20 Arrow II units are completed (total of 500 completed)
1,000 Arrow missiles are completed and split between all current units.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:47 PM
Post #935
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 23 2009, 09:07 AM
200/800 HELLADS Humvees
1/6 YAL aircraft
Skyguard defense system: 2.5% complete.
400/400 HELLADS Humvees
1/5 YAL aircraft
Skyguard defense system: 7.5% complete.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:48 PM
Post #936
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 23 2009, 09:07 AM
- Rakthor
- May 21 2009, 08:54 AM
- Rakthor
- May 20 2009, 02:32 PM
- Rakthor
- May 18 2009, 08:41 AM
- Rakthor
- May 15 2009, 09:41 AM
The 634 remaining M1A2 are to be converted to the SEPTUSK upgrade.
The 8597 M1A1 are also to be converted to the SEPTUSK upgrade.
All M1A2s have been converted. The M1A1s are now in the process.
1000 M1A1s have been converted.
1000 more M1A1s have been converted.
1000 more M1A1 converted.
1000 more M1A1s have been converted. total is now at 4000/4597
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:49 PM
Post #937
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 23 2009, 09:09 AM
- Rakthor
- May 21 2009, 08:56 AM
- Rakthor
- May 20 2009, 03:14 PM
All tanks and armored vehicles will have the Quick Kill active protection system installed.
This is 5% complete.
This is 12.5% complete.
This is 20% complete.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:51 PM
Post #938
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 21 2009, 08:58 AM
- Rakthor
- May 20 2009, 12:09 AM
- Rakthor
- May 18 2009, 08:45 AM
- Rakthor
- May 16 2009, 07:23 AM
- Rakthor
- May 11 2009, 04:45 PM
- Rakthor
- May 9 2009, 09:47 PM
America decides that due to the increase in global cost of grain, that corn based ethanol is not a viable alternative fuel source. Algae based ethanol is the new alternative fuel source that America is investing in. Funding has ceased for corn based ethanol and instead been put into algae based ethanol. The 85 million tons of corn set aside for ethanol research is instead to be sold to nations in need. The corn will be sold for $500 per ton. OOC: http://www.technologyreview.com/energy/18138/
America plans on turning 51 million acres of cropland not in rotation (keeping around 80 million of cropland not in rotation still unused) and turning them into algae farms. The farmland will be selected from current farmland that farmers are unable to use to produce traditional crops. This will help not interrupt any harvests currently underway and will not disrupt the main livelihood of the farmers. This is expected to also help offset more costs for farmers as well due to raising extra money from unused cropland. As such, within 3 years after the algae production begins, a review will take place about turning the other 80 million unused cropland into algae farms as well as reviewing the subsidies to farmers based on the growth of income gathered from the algae production.
The algae farms are prepared and has begun to grow algae. 10 algal oil refineries are being built.
The Algal refineries are 50% completed.
The refineries are 65% complete.
The refineries are 70% complete.
The refineries are 90% complete.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:51 PM
Post #939
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 21 2009, 04:00 PM
Lockheed-Martin, Boeing, General Dynamics, McDonnell-Douglas, and Northrup-Grumman are building 5 new factories apiece to help with military orders. 3 new shipyards are also to be built.
The factories and shipyards are 50% completed.
|
|
|
| |
|
Rakthor
|
May 25 2009, 05:52 PM
Post #940
|
- Posts:
- 5,031
- Group:
- Members
- Member
- #45
- Joined:
- March 9, 2009
|
- Rakthor
- May 21 2009, 09:45 PM
- Rakthor
- May 21 2009, 09:37 PM
- Rakthor
- May 11 2009, 04:45 PM
- Rakthor
- May 9 2009, 09:47 PM
America decides that due to the increase in global cost of grain, that corn based ethanol is not a viable alternative fuel source. Algae based ethanol is the new alternative fuel source that America is investing in. Funding has ceased for corn based ethanol and instead been put into algae based ethanol. The 85 million tons of corn set aside for ethanol research is instead to be sold to nations in need. The corn will be sold for $500 per ton. OOC: http://www.technologyreview.com/energy/18138/
America plans on turning 51 million acres of cropland not in rotation (keeping around 80 million of cropland not in rotation still unused) and turning them into algae farms. The farmland will be selected from current farmland that farmers are unable to use to produce traditional crops. This will help not interrupt any harvests currently underway and will not disrupt the main livelihood of the farmers. This is expected to also help offset more costs for farmers as well due to raising extra money from unused cropland. As such, within 3 years after the algae production begins, a review will take place about turning the other 80 million unused cropland into algae farms as well as reviewing the subsidies to farmers based on the growth of income gathered from the algae production.
20 million of the 51 million acres has been turned into man-made lakes. Water once used for the ethanol corn is now being used to fill up the lakes. The remaining 31 million acres will soon be turned into man-made lakes as well. The lakes will be left stagnant to allow for optimum algae growth.
Plastic lining will be laid down in all the current lakes. 21 of the other 31 lakes are called off. The time for the finishing of the lakes is now 4 months instead of two.
The lakes are all now lined and begin to receive water. Two months completion time.
|
|
|
| |
|
Jacapo Saladin
|
May 25 2009, 06:16 PM
Post #941
|
Administrator
- Posts:
- 6,212
- Group:
- Admin
- Member
- #1
- Joined:
- December 27, 2008
|
China will begin transforming our F-5 Tigers with the equipment to make them capable in the modern world. After undergoing the upgrades listed below, the aircraft will be reclassified within the PLAAF, listed as an attack aircraft.
The following changes will be made:
- KLJ-7 Radar - HUD - Two engines switched out for 1 WS-14 Dry thrust: 13,106 lbf Thrust with afterburner: 20,973 lbf - Avionics upgraded to use the new american equipment we have received, such as the cruise missiles, and other upgraded ATA missiles - Addition of IRST
|
|
|
| |
|
lardlad
|
May 25 2009, 06:18 PM
Post #942
|
- Posts:
- 2,692
- Group:
- Members
- Member
- #13
- Joined:
- December 29, 2008
|
OOC: Excuse me, but the Arrow II missiles, launch systems, and Green Pine radar systems are all Israeli. The manufacturers are all Israeli. Therefore, regardless of who funded it (which is both of us), you have to order them through me. I am completely obligated to accept that request, but you have no Arrow systems until you've ordered them from me.
|
|
|
| |
|
Jacapo Saladin
|
May 25 2009, 06:20 PM
Post #943
|
Administrator
- Posts:
- 6,212
- Group:
- Admin
- Member
- #1
- Joined:
- December 27, 2008
|
OOC: Lardlad is right, only israel can manufacture them
|
|
|
| |
|
lardlad
|
May 25 2009, 06:23 PM
Post #944
|
- Posts:
- 2,692
- Group:
- Members
- Member
- #13
- Joined:
- December 29, 2008
|
- Rakthor
- May 20 2009, 11:17 PM
The F-35 program is cut. The US cuts all funding to said project. All data gained is kept for possible future use and of course to build the orders for the nations who bought them. ((again, ya'll maintain that, not me))
OOC: Also, UK and a few other nations would still have the tech.
EDIT: In addition, way to cut a program that was going to be finished within a few months.. should have just cut your own orders.
|
|
|
| |
|
Mosley192
|
May 25 2009, 06:26 PM
Post #945
|
- Posts:
- 1,067
- Group:
- Members
- Member
- #33
- Joined:
- February 15, 2009
|
OOC: Yay for getting bent out of shape for pretty much nothing... :rolleyes:
EDIT- And yes, UK and other 1st level contributing nations would have the tech and information... to their respective parts of the project...
|
|
|
| |