Welcome Guest [Log In] [Register]
Welcome to World War 3 RP. We hope you enjoy your visit.


You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.


Join our community!


If you're already a member please log in to your account to access all of our features:

Username:   Password:
Add Reply
army info
Topic Started: Apr 22 2010, 04:42 PM (14,627 Views)
Midna
Member Avatar
The Faithless Fool
Members
A second COMPASS satellite prepares for launch at the Naro Space Center.
Offline Profile Quote Post Goto Top
 
Midna
Member Avatar
The Faithless Fool
Members
**Highly Classified**
Compass conversion of weaponry is 27% complete.

17 of 45 ICBM silos are complete.
12 of 13 research complexes complete.
14 of 22 aeronautics production facilities complete.
15 of 25 vehicles production facilities complete.
15 of 15 fuel/chemical manufacturing plants complete.
14 of 20 small arms production facilities complete.
21 of 30 ammunition production plants complete.
5 of 5 ICBM production facilities complete.
33 of 270 apartment villages is complete.
Emplacements 9% completed.
Offline Profile Quote Post Goto Top
 
Midna
Member Avatar
The Faithless Fool
Members
A limited license? Extrapolate, please.

Current Status

Seoul-Busan Route: The tunnel area is 100% complete. Route opens in two months after safety tests are done.

Jeju Commuter Rout: Tunneling is 92% complete.

Seoul and Pyongyang route: 100% complete. Route opens in two months after safety tests are done.

Japanese-Korean Connection Tunnel: Tunneling 93% complete
Offline Profile Quote Post Goto Top
 
Thelistener
Member Avatar

Members
A limited liscense would mean you would basically put in an order to us, however we will allow you to fulfill your own order. So in other words, you order another 20 sets, you can only build 20 more sets.
Offline Profile Quote Post Goto Top
 
Jacapo Saladin
Member Avatar
Administrator
Admin
China has reevaluated its position on foreign affairs. The USA has forced us to look at our foreign policy as a whole.

- Withdrawal of offer to help Bulgaria, as it was clearly pointed out to us by USA that they do not intend to abandon Bulgaria to any bears that may be lurking out there

- Withdrawal of our application to become a full member of PTO

- Recalling of subs back from Somalia

- Planes and groundcrew training in Red Flag called home.
Offline Profile Quote Post Goto Top
 
Jacapo Saladin
Member Avatar
Administrator
Admin
2000 Type 99A2/990

400 HQ-19/ 70

500 DF-45/130

500 PZL05 /350

2236 F-5A/B/C/e to J-9/ 2236

120 L-15 Trainer/120

10 Type 052C/ In construction since june 6

5 Type 041/ In construction since june 6

20 J-14 / 6

Offline Profile Quote Post Goto Top
 
Jacapo Saladin
Member Avatar
Administrator
Admin
Order of 20 LRIP J-14 cancelled with 14 remaining on the order. A real order of 500 is placed to be made full time in our 5 designated J-14 factories.


Our Type 99A2 order is to be produced at max capacity from now on.


With our J-9 Upgrades completed, we will now use those factories to produce the H-7. 250 are ordered.



Our reserve from the American cash payment of our debt is being tapped into to pay for the above

Cost of above = 97.5 billion
Offline Profile Quote Post Goto Top
 
Midna
Member Avatar
The Faithless Fool
Members
Very well, we will order 50 sets.
Offline Profile Quote Post Goto Top
 
Sturmgewehr
Member Avatar

Members
To combat the government's ever growing need for funds, the Federated States of Micronesia has instantiated a graduated property tax for the nation. It will be very low for the poorer populations and still low for the middle. It will be the large homes owned by the business barons, wealthy foreigners, huge businesses, and military/industrial depots that will have the percentage that makes up most of the new tax.
Offline Profile Quote Post Goto Top
 
Rakthor
Member Avatar

Members
190 CH-53D Sea Stallions- $18 million apiece
35 CH-53E Sea Stallions- $22 million apiece
10 AV-8BII+- $20 million apiece
250 Mamba APC- $8 million apiece
90 UH-1N Twin Huey- $12 million apiece
86 P-3C Orion- $40 million apiece
30 AH-64A Apache- $13 million apiece
30 F/A-18C/D Hornet- $30 million apiece
6 LA class Sub- $750 million apiece
Offline Profile Quote Post Goto Top
 
Rakthor
Member Avatar

Members
2 more Ohio class are now 75% complete.

20 Arrow II units are completed (total of 200/1000 completed)

1000 Arrow missiles are completed and split between all current units. (total of 8500/10000 missiles completed)

200/800 Green Pine systems
200/800 Citron Tree systems

Skyguard defense system: 100% complete.

The CVN-79 was laid down in 2010 and will be completed in 2015.
The CVN-80 is laid down now which is a year early, it will be completed in 2017.

The original remaining order of 6 Virginia class submarines are completed. The upgraded order (30 were planned) of 12 will be finished within 0 months(6) and 3 months(6).

5 more Virginia class subs are laid down- 26 months remaining.
5 more SeaWolf class subs are laid down- 51 months remaining.

The 2 Virginia class- 20 months remaining.
The 2 SeaWolf class- 45 months remaining.

647 Super Hornets- 30 completed. (135 completed)

241 AH-64D Apache Longbowe Block III- 30 completed (135 completed)

400 Strykers: 50 completed. (400 completed)

180 AH-1Z Vyper helicopters: 30 completed. (135 completed)
300 UH-1Y Venom helicopters: 30 completed. (135 completed)
315 Ch-53K: 30 completed. (235 completed)

3 more Sea Fighter class 10 months remaining.
2 more Freedom class 6 months remaining.
2 more Independence 19 months remaining.

The OHP class frigates are beginning to be updated with the Phalanx CIWS and the Mk 53 DLS "Nulka" missile decoy system: 100% completed

26 P-8 Poseidon (161 completed) have been delivered out of 161 to replace the P-3C Orion.

LHA-7 and LHA-8 22 months remaining.
Offline Profile Quote Post Goto Top
 
James Wilson
Member Avatar
MUHAHAHAHAHAHAHA.......
Members
Turkey will take the LA class subs, the Apache's, and the Hornets.
Offline Profile Quote Post Goto Top
 
Rakthor
Member Avatar

Members
30 AH-64A Apache
30 F/A-18C/D Hornet
6 LA class Sub

Total is $4.08 billion after discounts have been applied.
Offline Profile Quote Post Goto Top
 
James Wilson
Member Avatar
MUHAHAHAHAHAHAHA.......
Members
Money shall be wired.
Offline Profile Quote Post Goto Top
 
Rakthor
Member Avatar

Members
The construction of 300 new hydrogen fuel stations have been completed across America. The renovations of 800 existing stations to support hydrogen fueling has also been completed across America.


Another 10,242 cars have been sold.


ooc: 2850/150 new stations completed
7600/400 renovated stations completed
Offline Profile Quote Post Goto Top
 
ZetaBoards - Free Forum Hosting
Create your own social network with a free forum.
Go to Next Page
« Previous Topic · Spam · Next Topic »
Add Reply